Rewari-Bypass (Haryana)
Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of Haryana (Design Length-14.0 km) on Hybrid Annuity Mode (HAM).
State: Haryana
Project Cost: Rs. 522.02 Crores
Length: 14 KMs
Date of PCOD: 25.05.2023
Commissioned under: National Highways Authority of India (NHAI)
Mancherial - Repallewada (Telangana)
Four laning of NH-363 from Mancherial (Design Ch. 0.000/ Existing Km. 251.900) to Repallewada (Design Ch. 42,000/ Existing Km. 288.510) (Design Length = 42 Km) in the State of Telangana under NHDP Phase-IV under NH(0) on Hybrid Annuity mode.
State: Telangana
Project Size: 950.79 Crore
Length: 42 KMs
Date of PCOD: 30.12.2022
Commissioned Under: Adani Road Transport Ltd.
Nandurbar (Kolde) to Khetia PKG-7 (Maharashtra)
Rehabilitation and Upgradation of Nandurbar (Near Kolde) – Prakasha – Sahada - Khetia (SH-4 & SH-5) State Highway from existing Km 50+260 of SH-5, (Kolde) to km 90+220 (Kolde) [Design Ch.50+200 to Km 98+800] to Two Lane with paved shoulders/4 lane in the state of Maharashtra on Engineering, Procurement and Construction (EPC) basis contract.
State: Maharashtra
Length: 48.960 KMs
Date of PCOD: 29.02.2020
Project Size: Rs. 298.11 crore
Commissioned under: PWD Maharashtra
Bhawi - Pipar - Khimsar (Rajasthan)
Development & Up-gradation of Bhawi - Pipar - Khimsar Highway (SH-86C) Length 83.225 Km under RSHDP II (Package No. WB/RSHDP II/EPC 02).
State: Rajasthan
Project Size: Rs. 85.41 crore
Length: 83.225 KMs
Date of PCOD: 04.04.2022
Commissioned under: PWD Rajasthan
Kundal – Jhadol (Udaipur-Rajasthan)
Upgradation to Two Lane with Paved Shoulder configuration from Kundal to Jhadol (Section of NH-58 E), from Km. 0+000 to Km. 43+900 (Design Chainage), Package-I, District-Udaipur in the state of Rajasthan.
State: Rajasthan
Project Size: Rs. 187.11 crore
Length: 58.03 KMs
Date of PCOD: 24.08.2021
Commissioned under: Ministry of Road Transportation & Highways, Government of India
Gurgaon – Sohna
Six Laning and Strengthening of new NH-248A from existing km. 11.682 to existing km. 24.400 in the State of Haryana PKG - 2: Existing Ch. Km 24.400 (Design Ch. Km 9.282 to Km 22.000) under NHDP Phase IV on Hybrid Annuity Mode.
State: Haryana
Date of PCOD: 25.02.2022
Project Size: Rs. 515.00 Crore (Construction /EPC Cost)
Commissioned under: National Highways Authority of India
Hapur – Moradabad
Six laning of Hapur Bypass to Moradabad Section Including Hapur Bypass from km 50.000 to km 149.867 in the State of Uttar Pradesh on DBFOT (Toll) Basis under NHDP Phase-V. (Total Design Length-79.732 Kms).
State: Uttar Pradesh
Date of PCOD: 01.07.2022
Project Size: Rs 972.4 crore
Commissioned under: Modern Road Makers Private Ltd. (A subsidiary of IRB Infrastructure Developers Ltd.)
Jodhpur – Jojawar
Development & Upgradation of Jodhpur -Marwar Junction -Jojawar Highway (SH-61 & 61A) Length 119.095 Km under RSHDP -II Package No.: WB / RSHDP II/ EPC / 03).
State: Rajasthan
Date of PCOD: 15.11.2021
Project Size: Rs. 304.11 crore
Commissioned under: Rajasthan State Highway Development Program - II (RSHDP-II)
Narnaul Bypass
Construction of proposed Narnaul Bypass (design length 24.0 km) and Ateli Mandi to Narnaul Section of NH-11 from km 43.445 to km 56.900 (Design length 14.0km) as an Economic corridor and Feeder Route Package-2 in the state of Haryana on
Hybrid Annuity Mode
State: Haryana
Date of PCOD: 11.03.2022
Project Size: Rs. 801.00 Crores (Construction /EPC Cost)
Commissioned under: National Highways Authority of India (NHAI)
Rewari-Ateli Mandi
Upgradation of Four Lane of Rewari-Ateli Mandi section of NH-11 from km 11.780 at Rewari to Ex. Km 43.445 near Ateli Mandi (designed length 30.45 km) as Feeder Route in the state of Haryana on HAM.
State: Haryana
Date of PCOD: 15.11.2021
Project Size: Rs. 488.00 Crore (Construction /EPC Cost)
Commissioned under: National Highways Authority of India (NHAI)
Banar – Kuchera
Development and Upgradation of Banar- Bhopalgarh- Kuchera Highway (SH-63) Km to 126.500 under RSHDP -II (Package No.: WB / RSHDP II/ EPC / 01).
State: Rajasthan
Date of PCOD: 12.04.2021
Project Size: Rs. 207.11 crore
Commissioned under: Rajasthan State Highway Development Program - II (RSHDP-II)
Tonk - Sawai Madhopur
Two Laning with paved shoulder of Tonk- Sawaimadhopur section from Km. 1.300 to Km. 69.750 of NH-116 under NHDP Phase-IV on EPC mode in the State of Rajasthan on EPC mode.
State: Rajasthan
Date of commencement: 18.01.2017
Date of completion: 15.10.2019
Project Size: Rs. 216.11 crore
Commissioned under: National Highways Authority of India (NHAI)
Manoharpur - Dausa
Two laning with paved shoulder of Manoharpur-Dausa section of NH-11 A (New NH-148) from Km 62.100 (Design Ch. 0.000) to Km 0.000 (Design Ch. 62.318) in the State of Rajasthan on EPC mode.
State: Rajasthan
Date of commencement: 20.10.2016
Date of completion: 17.07.2019
Project Size: Rs. 198.21 crore
Commissioned under:National Highways Authority of India(NHAI)
Uncha - Nagla
Nature of work: Widening, strengthening and 2-laning, with paved the shoulder, of the Uncha-Nagla-Khanuawa-Roppas-Dholpur section of NH-123 on an EPC basis.
State: Rajasthan/Uttar Pradesh
Date of commencement: 24.02.2016
Date of completion: 01.10.2019
Project Size: Rs. 261.11 crore
Sitarganj
Two laning with paved shoulders of Sitarganj-Tanakpur section of NH-125 from Km 0.000 (Km 254.600 of NH-74) to Km 52.200 in the state of Uttarakhand under NHDP-IV on EPC mode.
State: Uttarakhand
Date of commencement: 02.09.2015
Date of completion: 20.11.2018
Project Size: Rs. 243.11 crore
Commissioned under: National Highways Authority of India(NHAI)
Yamuna - Expressway
Construction of Earthen EmbanKment , Culverts and Cart Track Underpasses for package A-13 (Km 132.690 to Km 142.740) and construction of Interchange Bridges and Vehicular underpasses for package no B-5 (Km 110.225 to Km 138.00 ), Additional work of Construction of Earthen Embankment, Culverts and Cart Track Underpass Pkg A-15 (b) for Yamuna Expressway.
State: Noida, Uttar Pradesh
Date of completion: 30.06.2012
Project Size: Rs. 116.06 crore
Commissioned under: Jaypee Associates
Kishangarh- Ajmer-Beawar
Six-laning of a stretch of the road (from Km. 364.125 to Km. 58.245) on the Kishangarh-Ajmer-Beawar section of National Highway No. 8.
State: Rajasthan
Date of completion: 08.06.2013
Project Size: Rs. 56.38 crore
Commissioned under: Isolux Corsan India Engineering & Construction Pvt. Ltd.
Sunel - (Jhalawar)
Nature of work: Rehabilitation of Raipur- Mundla- Garwara-Dubliya- Karodiya- Sunel- Sirpoi upto Bhawanimandi Boarder.(MDR-214) Km. 0/0 to 20/0
State: Rajasthan
Date of commencement: 28.08.2017
Date of completion: 27.11.2018
Project Size: Rs. 36.29 crore
Commissioned under: Public Works Department,Divn. -Jhalawar,Rajasthan
In Joint Venture with Ranjit Buildcon
Nature of work: Development and construction to four-laning of the Babatpur – Varanasi section of NH-56
State: Uttar Pradesh
Date of commencement: 15/09/2015
Project Size: Rs 126.93 crore (Our Share)/423.11 Cr(Total Cost)
Commissioned under: MORTH
Agra
Construction of Kuberpur to Fatehabad Road, Agra-Inner Ring Road (Phase-I).
State: Uttar Pradesh
Date of completion: 02.11.2016
Project Size: Rs. 306.95 crore
Commissioned under: Agra Development Authority
Jaipur- Tonk-Deoli
Construction of Four laning of Jaipur - Tonk - Deoli Section of NH- 12 from Km 63 + 000 to Km 114 + 000 (Package no - II).
State: Rajasthan
Date of completion: 25.03.2014
Project Size: Rs. 353.28 crore
Commissioned under: Modern Road makers Pvt. Ltd.(A subsidiary of IRB Infrastructure Developers Ltd.)
Chandrapur
Four Laning of Warora-Chandrapur-Ballarpur-Bamni Road and Bridges on SH-264, part of Warora to Chandrapur from Km. 40.00 to Km. 83.40 part of chandrapur to Bamni from Km. 94.00 to Km. 107.80 including Chandrapur bypass road (SH-266) from Km. 0.00 to Km. 5.20 and 1.20 Km. length of SH 267 in Chandrapur District of Maharashtra State.
State: Maharashtra
Date of completion: 14.08.2013
Project Size: Rs. 268.45 crore
Commissioned under: IL&FS Transportation Networks
Beawar- Pali-Pindwara
Roadworks upto Asphalt from chainage Km. 90.00 to Km. 130.00 for our Beawar-Pali-Pindwara Road Project, NH-14, Rajasthan.
State: Rajasthan
Date of completion: 20.11.2014
Project Size: Rs. 56.33 crore
Commissioned under: L&T ECC, Infra IC
Jaipur - Nagaur
Construction of Jaipur-Nagaur Road Km. 63/500 (Bhatipura) to Km. 101/700 (Narayanpura Tiraha) including Nawa and Mithari Bypass.
State: Rajasthan
Date of completion: 03.03.2014
Project Size: Rs. 47.16 crore
Commissioned under: RSRDC Ltd.
Jaipur - Nagaur
Nature of work: Construction of a segment of the Jaipur-Nagaur Road from Kalwar to Bhatipura
State: Rajasthan
Project Size: Rs. 60.09 crore
Faizabad
Widening and strengthening from Km.0+000 to 46+470 of NH-96 (New NH No.330) in the state of Uttar Pradesh under EPC mode.
State: Uttar Pradesh
Date of completion: 20.10.2016
Project Size: Rs. 171.11 crore
Commissioned under: Ministry of Road Transport and Highways (MoRT&H)
Jaipur - Kishangarh
Second Periodic Renewal Coat on Jaipur-Kishangarh Section of NH-08 (Km. 273.500 to Km. 363.885).
State: Rajasthan
Date of completion: 12.11.2015
Project Size: Rs. 145.11 crore
Commissioned under: GVK Jaipur Expressway Pvt. Ltd
Naraharpur to Kherli
Nature of work: Development of a section of the Badi-Baseri-Bayana-Weir-Bhusawar-Chpkarwada-Kherli and Kherli Bypass road including CD works from Naraharpur to Kherli
State: Rajasthan
Date of completion: 30.10.2014
Project Size: Rs. 58.21 crore
Commissioned under: RSRDC Ltd.
Bharatpur
Development of Road work of Bari-Baseri-Weir-Bhusawar-Chhonkarwara-Kherli-Nagar-Pahari upto Haryana Border Including CD working PKG 01 (Bari to Near Jaisora Km. 0/0 to 23/0).
State: Rajasthan
Date of completion: 15.09.2015
Project Size: Rs. 41.94 crore
Commissioned under: RSRDC Ltd.
Chittorgarh
Strengthening and widening of Hoda Bhadesar Awari Mata Nikumbh Crossing Bari Sadri Bansi Road MDR-182 (Km 0-0 to 59-0) (Total Length 59.00 Km).
State: Rajasthan
Date of completion: 31.05.2017
Project Size: Rs. 46.70 crore
Commissioned under: PWD
Bakani Raipur
Construction of High Level Bridge in Km. 7/0 (Near Bhumada village) with approaches Across River Kali Sindh on Bakani Raipur Pirawa Rampuriya Patpara road upto M. P. Border (MDR 177).
State: Rajasthan
Date of completion: 05.03.2018
Project Size: Rs. 40.69 crore
Commissioned under: PWD
Kaithal
Construction or four laning of Kaithal Rajasthan border section of NH-152/65 from Design Km o+500 to Km. 41-065 (PKG.-lA) in the State of Haryana.
State: Haryana
Date of completion: 04.07.2017
Project Size: Rs. 457.52 crore
Commissioned under: Modern Road makers Pvt. Ltd.(A subsidiary of IRB Infrastructure Developers Ltd.)
Nandagaon - Morshi
Rehabilitation and Upgradation of Amaravati-Nandgaon Peth-Morshi-Warud-Pandhurna Section from Nandgaon Peth to Morshi Section of NH-353K to Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract
State: Maharashtra
Date of commencement: 13.06.2017
Date of PCOD: 07.11.2019
Project Size: Rs. 243.11 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Morshi - Achalpur
Rehabilitation and upgradation of Morshi-Chandurbazar-Achalpur Highway from existing Km 0+000 (Morshi) to Km 53+719 (Achalpur) to two lane with paved shoulders in the state of Maharashtra on EPC basis contract.
State: Maharashtra
Date of commencement: 13.06.2017
Date of PCOD: 15.12.2020
Project Size: Rs. 238.71 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Bhandara
Rehabilitation and Upgradation of Bhandara – Khat –Ramtek –Mansar – Mauli – Nayakund –Parseoni – Saoner to joint NH 547 E , PKG – I, Bhandara to Ghotitok, from Km. 166+640 to Km. 205+214 (Design Chainage) to two lane with Paved shoulders/ Four lane configuration in the state of Maharashtra on EPC mode.
State: Maharashtra
Date of commencement: 15.06.2017
Date of PCOD: 31.12.2019
Project Size: Rs. 257.61 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Katol - Warud
Rehabilitation and Upgradation of Nagpur-Katol-Warud National Highway from existing Km 60+100 (End of Katol bypass) to 101+085 (Warud up to Joint junction). (Design chainage 60+100 to 100+565) Two lane with paved shoulders in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract.
State: Maharashtra
Date of commencement: 12.06.2017
Date of PCOD: 31.01.2020
Project Size: Rs. 314.21 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Morshi-Wardhariver
Rehabilitation and Upgradation of two lane with paved shoulder configuration from Morshi to MH/MP border Design Ch. Km. 43.000 to Km. 95.390 Section of National Highway No.353J in the state of Maharashtra on Engineering, Procurement & Construction (EPC) Basis Contract
State: Maharashtra
Date of commencement: 13.06.2017
Date of PCOD: 07.12.2019
Project Size: Rs. 294.51 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Amdi Junction to Saoner
Upgradation of NH – 753 Starting from its Junction with NH - 53 near Duggipar connecting Goregaon, Gondia, Tirora, Tumsar, Jam, Ramtek, Parseoni, Khapa and terminating at its Junction with NH -47 near Saoner Section from Amdi Junction to Saoner, PKG–II, from Km. 226+140 to Km. 265+724 (Design Chainage) to two lane with Paved shoulders/ Four lane configuration in the state of Maharashtra on EPC mode.
State: Maharashtra
Date of commencement: 12.06.2017
Date of PCOD: 29.02.2020
Project Size: Rs. 258.33 crore
Commissioned under: PWD, NH Division, Nagpur, MORTH
Balotra
Upgradation to two lane with paved shoulder for section from Km 58.000 to Km 91.600 (excluding Ch (59.460 to 62.900) and (73.120 to 75.920), (82.650 to 85.300) ) Balotra to Sanderao via Jalore section of NH-325 in the State of Rajasthan (PKG-II).
State: Rajasthan
Date of commencement: 20.07.2017
Date of PCOD: 31.12.2019
Project Size: Rs. 113.31 crore
Commissioned under: Ministry of Road Transport and Highways (MoRT&H), Government of Rajasthan
Gulabpura to Chittorgarh
Six Laning of Gulabpura to Chittorgarh section of NH-79 from Design Km 138+870 to Km 213+870 (Package-2) in the state of Rajasthan under NHDP Phase V through Public Private Partnership (PPP) on Design, Built, Operate and Transfer (DBFOT) Toll Basis.
State: Rajasthan
Date of commencement: 03.11.2017
Date of PCOD: 30.06.2021
Project Size: Rs. 711.33 crore
Commissioned under: Modern Road Makers Private Ltd. (A subsidiary of IRB Infrastructure Developers Ltd.)
Delhi - Vadodara (PKG-4)
Completion of 8-lane carriageway starting at Haryana-Rajasthan border, ending at Junction with SH44 (Km 78+800 to Km 115+700) section of Delhi-Vadodara Green Field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana (Pkg-4) in the state of Rajasthan.
State: Rajasthan
Date of commencement: 10.12.2019
Date of COD: 26.06.2022
Project Size: Rs. 997.11 Crore
Commissioned under: National Highways Authority of India (NHAI)
Delhi - Vadodara (PKG-8)
Completion of 8-lane access-controlled Expressway starting near start of RoB near junction with NH-11A to junction with MDR-1 (Baonli-Jhalai road) (Ch. 214.260-247.310) section of Delhi – Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan.
State: Rajasthan
Date of commencement: 07.11.2020
Date of COD: 06.02.2023
Project Size: Rs. 880.11 Crore
Commissioned under: National Highways Authority of India (NHAI)
Chittorgarh - Udaipur
Six Laning of Chittorgarh-Udaipur Section of NH-76 Section-1 from design chainage Ch 214+870 to 263+870 +additional 15Km top layer & RE Wall, Road Furniture, Street Light (Ch.263+870 to 278+870).
State: Rajasthan
Date of commencement: 03.07.2017
Date of PCOD: 13.04.2021
Project Size: Rs. 483.37 crore
Commissioned under: TPL-HGIEPL Joint Venture
GE - Airforce
Nature of work: GE Military Engineering Services
State: Rajasthan
Project Size: Rs. 100.24 crore
Commissioned under: MES
Khonsa section of NH-52B
Nature of Work: Rehabilitation and augmentation of two-laning from the Changlang District Boundary to the Khonsa section of NH-52B. The Arunachal Pradesh package of SARDP_NE on an EPC basis
State: Arunachal Pradesh
Date of commencement: 15/06/2016
Scheduled date of completion: 14/06/2019
Project Size: Rs 100.26 crore (Our Share)/334.22 crore(Total Cost)
Commissioned under: NHIDCL