Kanpur-Central Railway Station (UP)


Redevelopment of Kanpur Central Railway Station at Kanpur on Engineering, Procurement and Construction (EPC) mode.
State : Uttar Pradesh
LOA Date : 5 June, 2023
Project Cost : INR 655.1 Crores
Commissioned Under : Ministry of Railways


Dhule Nardana Railway


Construction of New BG Line Between Dhule (Borvihir) to Nardana (Approx. 49.45 Km) of Central Railway
State : Maharashtra
Length : 49.45 Km
LOA Date : 02 Feb, 2024
Project Cost : INR 716.11 Crores
Commissioned Under : Central Railway


Karanjgaon Aurangabad Railway


Doubling of Track between Karanjgaon station (Including) at Km 69.01(Ch69010) & Aurangabad station (Including) at Km 113.15(Ch 113150) [i.e. (44.14 km)] including Electrification and Signaling works in connection with Aurangabad- Ankai Doubling Project in Nanded Division of South Central Railway.
State : Maharashtra
Length : 44.14 Km
LOA Date : 01 March, 2024
Project Cost : INR 447.11 Crores
Commissioned Under : South Central Railway


Kalimandir-Dimna Chowk


Construction of 4 lane Elevated corridor of Kalimandir- Dimna Chowk- Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in Jharkhand.
State : Jharkhand
Length : 10.02 Km
LOA Date : 09 March, 2024
Project Cost : INR 610.11 Crores
Commissioned Under : National Highways Authority of India (NHAI)


Gaya-Son Nagar Pkg-4


Construction of double line track (3rd & 4th line) formation including earth work, blanketing, minor bridges, major bridges, electrification works and other miscellaneous works for 32.5 T axle load including Electrical TRD (2x25 KV) in Gaya-Son Nagar section (in between DFCC CH:225.300 (IR CH:475.200) to DFCC CH:292.175 (IR CH:542.075)) in DDU Division of East Central Railway in the state of Bihar.
State : Bihar
Length : 66.88 Km
LOA Date : 12 March, 2024
Project Cost : INR 709.11 Crores
Commissioned Under : East Central Railway


Chennai-Tirupati Package-II


Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border (Design Chainage km 61+51) to Puttur (Design Chainage Km 81+450) of NH-716 & 6 Lane with Paved Shoulders from Mallavaram (Design Chainage Km 97+100) to Renigunta (Design Chainage Km 114+500) of NH-71 in Andhra Pradesh on Hybrid Annuity Mode under NH(O) (ChennaiTirupati Package-II).
State : Andhra Pradesh
Length : 37.43 Km
LOA Date : 11 March, 2024
Project Cost : INR 862.11 Crores
Commissioned Under : National Highways Authority of India (NHAI)


Rewari-Bypass

Construction of proposed Rewari Bypass (design length 14.4 Km) as Feeder Route in the state of Haryana on Hybrid Annuity Mode

State: Haryana

Project Cost: Rs. 432.00 Crore (Construction /EPC Cost)

Commissioned under: National Highways Authority of India (NHAI)

Delhi-Vadodara (PKG-8)

Construction of Eight Lane access controlled Expressway starting near start of RoB near Junction with NH-11A to junction with MDR-1 (Baonli-Jhalai road)(Ch. 214.260-247.310) section of Delhi – Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan

State: Rajasthan

Project Cost: Rs. 880.11 Crore

Commissioned under: National Highways Authority of India (NHAI)

Delhi-Vadodara (PKG-9)

Construction of Eight Lane carriageway starting near junction with MDR-1 (Baonli-Jhalai road) to end of interchange on NH-552 (Tonk-Sawaimadhopur) near village Mui (Ch. 247.310 - 292.950) section of Delhi – Vadodara access controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode

State: Rajasthan

Project Cost: Rs. 1258.11 Crore

Commissioned under: National Highways Authority of India (NHAI)

Raipur-Visakhapatnam (PKG-5 & PKG-6) Odisha

Development of Six Lane Kaliagura-Baunsaguar Section & Baunsaguar-Baraja Section of NH-130-CD Road from km 249+000 to km 293+000 (PKG-5), and from km 293+000 to km 338+500 (for PKG-6) under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package-OD-5) (Length 44.00 km), (Package-OD-6) (Length 45.500 km).

State: Odisha

Project Size:
PKG-5: 1492.11 Crores
PKG-6: 1123.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Raipur-Visakhapatnam (PKG-1) Andhra

Development of Six Lane Aluru-Jakkuva Section of NH-130-CD Road from km 365.033 to km 396.800 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package- 1 (AP).

State: Andhra Pradesh

Project Size: 1060.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Raipur-Visakhapatnam (PKG-5 & PKG-6) Odisha

Development of Six Lane Kaliagura-Baunsaguar Section & Baunsaguar-Baraja Section of NH-130-CD Road from km 249+000 to km 293+000 (PKG-5), and from km 293+000 to km 338+500 (for PKG-6) under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package-OD-5) (Length 44.00 km), (Package-OD-6) (Length 45.500 km).

State: Odisha

Project Size:
PKG-5: 1492.11 Crores
PKG-6: 1123.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Khammam-Devarapalle (PKG-2)

Construction of 4 lane Access Controlled New Greenfield Highway Section of NH 365BG Khammam-Devarapalle of length 29.513 km Design Ch 33.604 to 63.117 under Inter Corridor Route under BMP on HAM in the state of Telangana.

State: Telangana

Project Size: 637.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Beawar Masuda Goyala Section

Development and Maintenance of (i) Beawar Masuda Goyala Section of SH 26A (Length 66.77 km); (ii) Arain Sarwar Section of SH-7E (Length 44.260 km) & (iii) Laxmipura Dora Dabi Ranaji Ka Gudha Section of SH-115 (Length 49.60 km); (Total length: 160.630 km) through Public Private Partnership (the “PPP”) under Design, Build, Operate/Maintain & Transfer (the “DBOT Hybrid Annuity”) basis.

State: Rajasthan

Project Size: 448.11 Crores

Commissioned Under: PWD

Neelmangala–Tumkur section of NH-48

6-laning with access control from km 29.435 to km 74.168 of Neelmangala – Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna.

State: Karnataka

Project Size: 844.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Delhi Metro Rail Corporation (Delhi)

Construction of Elevated Viaduct and four Elevated Stations viz. Keshopur, Paschim Vihar, Peeragarhi and Mangolpuri (Length- 3.511 km).

State: Delhi

Project Cost: INR 412.11 Crores

Commissioned Under: Delhi Metro Rail Corporation (DMRC) Limited

Karnal Ring Road (Haryana)

Construction of 6-lane Greenfield Karnal Ring Road starting from NH-44 near Village Shamgarh and terminating at Karnal – Munak Road, near Village Samalakha under ‘Bharatmala Pariyojana’ in the State of Haryana on Hybrid Annuity Mode (Length- 34.500 km).

State: Haryana

Project Cost: INR 997.11 Crores

Commissioned Under: National Highways Authority of India

Ganga Expressway Group-II

Execution of Civil & Associated works on Engineering Procurement & Construction (EPC) basis of Development of an Access-Controlled Six lane (Expandable to Eight lane) Greenfield ‘Ganga Expressway’[Group-II, from Km. 137+600 (Village: Nagla Barah, Distt: Budaun) to Km. 289+300, (Village: Ubariya Khurd, Distt: Hardoi), Design length=151.700 Km] in the State of Uttar Pradesh on DBFOT (Toll) basis under PPP.

State: Uttar Pradesh

Project Cost: INR 4970.99 Crores

Commissioned Under: Uttar Pradesh Expressways Industrial Development Authority (UPEIDA)

Bhanupali-Bilaspur-Beri, Himachal Pradesh

Construction of foundations, substructure and superstructure along with river training/protection work, earthwork and allied works for viaduct 1 & 2 in between chainage Km 47+415 To Km 50+900, in connection with Bhanupali-Bilaspur-Beri New Railway Line in district Bilaspur of Himachal Pradesh (Length- 3.485 km)

State: Himachal Pradesh

Project Cost: 466.11 Crores

Commissioned Under: Rail Vikas Nigam Limited (RVNL)

Varanasi-Ranchi-Kolkata Highway (PKG-10)


Construction of 6-lane greenfield Varanasi-Ranchi-Kolkata Highway from Deoria village to Donoreshan village from KM 253.000 to KM 288.600 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid Annuity Mode (HAM).
State : Jharkhand
Length : 35.60 KMs
LOA Date : 31 Mar, 2023
Project Cost : INR 1303.11 Crores
Commissioned Under : National Highways Authority of India (NHAI)


Varanasi-Ranchi-Kolkata Highway (PKG-13)


Construction of 6-lane greenfield Varanasi-Ranchi-Kolkata Highway from junction with NH 320 in Lepo village to Kamlapur village (JH/WB border) from KM 358.5 to KM 387.2 under Bharatmala Pariyojana in the state of Jharkhand on Hybrid Annuity Mode (HAM).
State : Jharkhand
Length : 28.70 KMs
LOA Date : 31 Mar, 2023
Project Cost : INR 925.11 Crores
Commissioned Under : National Highways Authority of India (NHAI)


Khammam-Devarapalle (PKG-1 & PKG-2)

Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG of length 33.604 km (for PKG-1) & length 29.513 km (for PKG-2) from Thallampadu village to Somavaram village Design Ch 0.000 to 33.604 (for PKG-1) & Design Ch 33.604 to 63.117 (for PKG-2) under Inter Corridor Route under BMP on HAM in the state of Telangana.

State: Telangana

Project Size:
PKG-1: 772.11 Crores
PKG-2: 637.11 Crores

Commissioned Under: National Highways Authority of India (NHAI)

Mancherial- Repallewada

Execution of Civil & associated works on Engineering Procurement & Construction (EPC) basis for Four Laning of NH-363 from Mancherial (Design Km 0+000/ Existing Km 251+900) to Repallewada (Design Km 42+000/ Existing Km 288.510) (Design Length 42.000 Km) in the state of Telangana under NHDP Phase-IV under NH(O) on Hybrid Annuity Mode.

State: Telangana

Project Size: 950 Crore

Commissioned Under: Adani Road Transport Ltd.

Narnaul Bypass

Construction of proposed Narnaul Bypass (design length 24.0 km) and Ateli Mandi to Narnaul Section of NH-11 from km 43.445 to km 56.900 (Design length 14.0km) as an Economic corridor and Feeder Route Package-2 in the state of Haryana on Hybrid Annuity Mode

State: Haryana

Project Size: Rs. 801.00 Crore (Construction /EPC Cost)

Commissioned under: National Highways Authority of India (NHAI)

Rewari-Ateli Mandi

Upgradation of Four Lane of Rewari-Ateli Mandi section of NH-11 from km 11.780 at Rewari to Ex. Km 43.445 near Ateli Mandi (designed length 30.45 km) as Feeder Route in the state of Haryana on HAM.

State: Haryana

Project Size: Rs. 488.00 Crore (Construction /EPC Cost)

Commissioned under: National Highways Authority of India (NHAI)

Gurgaon – Sohna

Under a domestic competitive bidding tender, in Novemeber 2017, HG Infra won a bidding tender for the six-laning and strengthening of a segment of the new NH-248A (from Existing Km 11+682 to Existing Km 24+400) in the State of Haryana. The project, which fell under the Construction, Infrastructure and Civil Work category, entailed the design, build, operate and transfer of this highway segment under the NHDP.

State: Haryana

Project Size: Rs. 515.00 Crore (Construction /EPC Cost)

Commissioned under: NHDP

Delhi-Vadodara (PKG-4)

Construction of 8-Lane Carriageway starting at Haryana-Rajasthan border and ends at Junction with SH44 (Km 78.800 to Km 115.700) section of Delhi-Vadodara Green Field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in Rajasthan.

State: Rajasthan

Project Size: Rs. 997.11 Crore

Commissioned under: National Highways Authority of India (NHAI)